Skip to main content

Schedule v2 – Layout and navigation

Set up the Schedule the way you like it, and move quickly between weeks with the new navigator.

Written by Tobias Ritlov

In Schedule v2 you decide how the Schedule looks. You can make rows lower to fit more employees on the screen, make days narrower to fit more of them, and move between weeks with the new navigator at the bottom of the Schedule.


The toolbar

At the top of the Schedule you'll find the toolbar. The buttons you'll use most for layout and navigation are:

  • The dates – shows the period you're looking at. Click the arrows to move back or forward, or click the dates to pick a period.

  • Employee | Zone – switch between the employee view and the Zone view.

  • Weeks | Days – switch between whole weeks and the Days view.

  • Layout – choose how the rows, columns and zones are shown.

The toolbar, with the dates, Employee | Zone, Weeks | Days and Layout highlighted

💡 On a smaller screen, the toolbar adjusts itself: the buttons show only their icons, and the dates become a calendar icon. If there still isn't room, Employee | Zone and Weeks | Days move into the Layout menu.


The Layout menu

Click Layout in the toolbar to open the menu. Each choice has a small picture that shows what it does, and your choice is applied straight away. Click outside the menu (or press Esc) to close it.

The Layout menu open, showing Rows, Columns and Zones

Rows – the height

Choice

What it does

Good for

Standard

The start and end time on two lines, with room for the labels.

Seeing all the details on each shift.

Compact

One line per shift, so the rows are lower.

Large stores – fit many more employees on the screen.

The same week in Standard rows and in Compact rows, side by side

Columns – the width

Choice

What it does

Good for

Wide

More room in each day.

Seeing the times and labels clearly.

Narrow

Slimmer days, so more of them fit.

Seeing two whole weeks at once, or working on a smaller screen.

Until you make a choice, the Schedule picks the width that fits your screen best.

ℹ️ Columns only apply in the Weeks view. In the Days view they are greyed out.

The same week in Wide and Narrow columns, side by side

Zones – the colours

This section is only shown if your store uses zones.

Choice

What it does

Full colour

The whole shift is shown in its zone's colour.

Bottom line

All shifts are the standard green, with a thin line in the zone's colour along the bottom. This is calmer to look at if you have many zones.

Shifts in Full colour and with Bottom line, side by side

💡 Tip: Try combining the choices. Compact rows + Narrow columns gives you the best overview of a large store, while Standard rows + Wide columns shows the most detail on each shift. Read more about how the labels change with each layout in Labels, hover and shift details.


The navigator

The navigator floats at the bottom of the Schedule. It shows the whole planning period as a row of small bars – one bar per week – with the month names above them.

  • The blue bar is the current week. Click it to jump back to this week.

  • The blue frame shows the weeks you're looking at right now.

The navigator, with the blue bar (this week) and the blue frame (weeks in view) pointed out

How to move between weeks

  • Drag the blue frame to the weeks you want to see.

  • Click a week to jump straight to it.

  • Click the arrows on either side to move one week at a time. Hold the arrow down to keep moving.

While you move, a small label shows which weeks you're about to see (for example Weeks 45 – 47).

Keyboard shortcuts

Key

What it does

← and →

Move one week back or forward

T

Go back to this week

ℹ️ The shortcuts don't work while you're typing in a field.


Scroll or Full weeks

At the right end of the navigator there's a button that shows how the weeks are displayed: Scroll or Full weeks. Click it to open a menu where you can switch between the two.

The Scroll / Full weeks menu open above the navigator

Scroll (default)

The whole planning period is loaded into one long Schedule, and you can scroll freely through all of it. The blue frame in the navigator follows along as you scroll.

  • ✅ Scroll smoothly through the entire planned period – no waiting between weeks.

  • ⚠️ Takes longer to load, especially for long planning periods or large stores, because everything is loaded at once.

Full weeks

The Schedule shows as many whole weeks as fit on your screen, and moves one week at a time. Only the employees who are relevant for those weeks are shown.

  • ✅ Loads faster, because only the weeks you're looking at are loaded.

  • ℹ️ When you drag the frame, the Schedule stays where it is until you let go – then it reloads to show the new weeks. Clicking an arrow or a week works the same way.

When you switch between Scroll and Full weeks, you stay on the same weeks.

💡 Which one should I use? Use Scroll when you want to move freely across the whole period. Use Full weeks if you have a long planning period or a large store, and want the Schedule to load faster.


Related articles

More questions?

You are always welcome to contact us via chat 😊

🖥️ Web / PC: Click the blue chat bubble in the bottom-right corner.
📱 App: Go to More → Support → Chat with us.

Did this answer your question?